designing for spaces
(the end-of-the-year show)

 

Week 01: 2/07/2012: Determine exhibition goals, audiences, and contexts (spaces)

Week 02: 2/14/2012: Determine conceptual and formal system

Week 03: 2/21/2012: Studies for application to different media.

Week 04: 2/28/2012: Design Development

Week 05: 3/06/2012: Design Development

Week 06: 3/13/2012: Design Development

Week 07: 3/20/2012: Prototyping. Publicity begins

3/26/2012: Spring Break

Week 08: 4/03/2012: Prototyping

Week 09: 4/10/2012:  Fabrication

Week 10: 4/17/2012: Fabrication

Week 11: 4/24/2012: Fabrication

Week 12: 5/01/2012: Gathering work, materials, fabricating components

Week 13: 5/08/2012: Install show

Week 14: 5/15/2012: Install show